Building kits sold nationally

Installation of buildings only available within 50 mile radius of El Dorado, KS

Userway widget by Webact

Building Pole Barns & Quality Buildings in Kansas for Over 20 Years


ATTENTION TO DETAIL

TIMELY

SERVICE

HIGHLY TRAINED

& SKILLED

FAMILY OWNED

& OPERATED

Functional Hybrid Buildings

Choose the construction experts at Mid-Kansas Pole Barns when you need sturdy hybrid buildings. We have over 20 years of experience serving customers in the Midwest. 


Call us for A FREE estimate today.

LEARN MORE

WOOD FRAMED BUILDINGS

Rusty and the crew were easy to work with. They did a great job of tying the addition into the existing building.  Easy to communicate with and impressed with how on target the original estimate was in comparison with the final cost. - Kelly T.

*Please provide your Name, City, Phone Number (will only be used if we have a question while bidding) and email address.


Wood Framed vs. Hybrid Steel Framed:

Wood- Traditional framed, trusses and posts are constructed with treated lumber, lower cost
Hybrid- Trusses and posts are steel constructed, stronger, higher cost vs. wood


Metal Panels: 

29 gauge and 26 gauge are available. 26 gauge will be a thicker steel (approx. 25% thicker) this is usually used for residential buildings or high end Ag buildings. 29 gauge generally is all that is needed for a typical Ag building and will reduce your cost more than if the 26 gauge is used.

Doors:

Overhead doors, Sliding doors, Entry doors (typically 3') Also insulated or non-insulated.


Windows: 

Sizes and number of windows, standard bid with 3'x3' sliders, any special requirements you would like. Ex. White, Tan, Casement, Single hung, Sliders...


Insulation: 

*Astro-foil insulation gives a R-7 insulation value. This helps control condensation, has a Class A fire rating and reflects radiant heat. 

* 2" vinyl backed insulation is also available. It has a R-11 insulation value. This will cost a little more but will reduce energy cost, help control condensation and improve noise control.


Concrete: 

Typically we pour a 4" thick concrete slab for the building pad, however if there will be heavy equipment going on it, it is preferred to use 5-6" thick slab.

REQUEST BID

Share by: